My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP REPORT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
100609
>
WORKSHOP REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2009 11:47:05 AM
Creation date
9/30/2009 12:42:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/6/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
WORKSHOP REPORT AND ATTACHMENTS 2 AND 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As indicated, staff is recommending the City Manager negotiate an amendment to the <br /> Agreement with Field Paoli for completion of the final phase of the project. The Capital <br /> Improvement Program Civic Center Site Improvements Reserve (CIP 98029) that <br /> includes expansion of the Pleasanton Library, removal of the modular buildings, a new <br /> city hall office building, and a community /youth center on the Bernal Property, has a <br /> balance of approximately $2.5 million which can be used for funding the additional <br /> analysis outlined in this report. The project cost is estimated to not exceed $45,000. <br /> Submitted by: Approved y: <br /> Julie Farnsworth Steven Bocian Nelson Fialho <br /> Director of Library Services Asst. City Manager City Manager <br /> Attachments: <br /> A. Field Paoli Library Technical Study/ Conceptual Library Design/ Preliminary Cost <br /> Analysis (includes Appendix) <br /> B. Civic center site plan site concepts <br /> C. Library Commission Minutes from March 8, 2007. <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.