Laserfiche WebLink
11. That the new street serving this development be a public <br /> street a minimum 28 ft. in width, face of curb to face of <br /> curb; the developer shall dedicate as right-of-way that area <br /> between westerly property line to the easterly back-of-curb <br /> from Vineyard Avenue to the southerly bend; the right-of-way <br /> at the cul-de-sac proper shall be from back of sidewalk to <br /> back of sidewalk. A P.S.E. a minimum 8 ft. in width shall <br /> run along the easterly edge of right-of-way, and the sidewalk <br /> shall be located in a public easement satisfactory to the <br /> City Engineer. The intersection design shall be subject to <br /> final City review and approval at the time the first <br /> subdivision map is approved. <br /> <br /> 12. That all landscaping on the chapel site including that in the <br /> dedicated right-of-way, including that within the entire 10 <br /> ft. buffer along the western property line and all medians <br /> shall be installed and maintained by the Church of Jesus <br /> Christ of Latter-Day Saints. <br /> <br />13. That the grading for the residential portion of the project <br /> shall be balanced cut and fill and shall be as shown on the <br /> preliminary grading plan on file with the Planning <br /> Department. <br /> <br />14. That the applicant shall construct Vineyard Avenue <br /> improvements across the frontage of the site as shown on the <br /> plan, and as required by the City Engineer, including <br /> transition areas as necessary to effect the 5 ft. bike lanes, <br /> two minimum 12 ft. travel lanes, one dual left turn lane of a <br /> minimum 11 ft., and a monolithic 5 ft. sidewalk along the <br /> south side of Vineyard Avenues. Said roadway improvements <br /> shall endeavor to retain the existing northerly edge of <br /> pavement and retain as much on-street parking westerly of the <br /> site as possible. The entire construction and striping of <br /> the Vineyard Avenue improvements associated with the <br /> development shall be approved by the County of Alameda and <br /> City Engineer; this project approval shall be contingent upon <br /> the ability of the project to implement street improvements <br /> incorporating dual bike lanes, dual through lanes, and a dual <br /> left-turn lane. Needed right-of-way along Vineyard Avenue <br /> shall be dedicated. <br /> <br />15. That all grading adjacent to property lines shall be adjusted <br /> to ensure privacy of yards and is subject to approval by the <br /> City Engineer and Planning Director. <br /> <br />16. The final design of the mechanical equipment screens shall be <br /> subject to approval of the Planning Director and shall be <br /> faced to match the materials of the chapel building. <br /> <br />17. That the final street light design be submitted to the <br /> Planning Director for final approval. <br /> <br />18. That the developer shall provide water, storm drain and <br /> sanitary sewer, to City Standards, to serve this development. <br /> These systems shall be accepted by the City and be publicly <br /> <br /> <br />