Laserfiche WebLink
D R A F T M A S T E R P L A N F O R T H E D P T S <br />TABLE OF CONTENTS PAGE <br />INTRODUCTION <br />Project Elements <br />The Master Plan Document <br />Goals <br />Process <br />Conclusions <br />Highlights <br />BACKGROUND <br />The Purpose of the Master Plan <br />Community Participation <br />Master Plan Process Chronology <br />Historical Notes on Downtown Pleasanton <br />Downtown Today <br />Previous Studies <br />PROGRAM <br />Introduction <br />Program <br />DESIGN RECOMMENDATIONS <br />Project -Wide Recommendations <br />Wayside DeLucchi Parks <br />Fire Station No. 1 <br />Regional Trail Corridor <br />Arroyo del Valle <br />Main St. Bridge <br />Main St. Green <br />NEXT STEP S3 <br />Budgeting Project Approval <br />APPENDIX <br />Fire Station No. 1 Conceptual Design Process <br />Proposed design plans for each site <br />TABLE OF CONTENTS <br />3 <br />5 <br />17 <br />