Laserfiche WebLink
34. The developer/owner shall install public street improvements <br /> across the Foothill Road frontage of the site, as shown on the <br /> approved alignment study, as well as any required off-site <br /> transitions, all to the satisfaction of the City Engineer, in <br /> conjunction with improvements for the first final map for the <br /> site. <br /> <br />35. The private entrance drive from Foothill Road shall provide <br /> for a left and right turn onto Foothill Road and pedestrian <br /> and bicycle access, in addition to the entrance lanes. <br /> <br />36. The developer/owner shall contribute $3S,000 as its share ~f <br /> the intersection improvements and traffic signal at the <br /> intersection of Foothill Road and Bernal Avenue. Payment ~or <br /> said improvements shall be made by the developer prior to the <br /> filing of a final map on this site. <br /> <br />37. No blasting shall be allowed in conjunction with the site <br /> grading unless approved by the City Engineer. <br /> <br />38. The project shall be subject to the "Standard Conditions of <br /> Approval" except Conditions No. 5, 6, 7, 8, 12, 14, 29, 31, <br /> 50, 55 and 56. <br /> <br />(pud8515.m11) <br />8/ /s8 <br /> <br /> <br />