My WebLink
|
Help
|
About
|
Sign Out
RES 02030
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2002
>
RES 02030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2002 3:59:34 PM
Creation date
4/13/2002 3:50:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/5/2002
DOCUMENT NO
RES 02030
DOCUMENT NAME
DOWNTOWN
NOTES
CEQA FINDINGS
NOTES 3
SPECIFIC PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by .conducting town meetings and employing subcommittees to address a wide range of <br />topms. A report containing the Committee's final recommendations was consolidated in <br />December 2000, and staff completed the Draft Specific Plan in July 2001. <br /> <br />Alternative 2: Transportation Alternative <br /> <br />Description <br /> <br />The alternative is similar to the Proposed Specific Plan. but includes a roundabout at <br />Bemai Avenue and Main Street, <br /> <br />Finding: Infeasible <br /> <br />This transportation alternative was not pursued because subsequent analysis within the <br />transportation section of the EIR revealed there was no practical difference between <br />operation of a roundabout and five-legged intersection, and both options do not operate as <br />well as the existing geometry fi.om a traffic circulation standpoint. Thus, the <br />transportation alternative was not pursued because transportation impacts would not be <br />addressed by implementation of a roundabout or a five-legged intersection. <br /> <br />Alternative 3: Railroad Extension Alternative <br /> <br />Description <br /> <br />This alternative is similar to the Proposed Specific Plan. but adds the Niles Canyon <br />Railway extension along the Alameda County Transportation Corridor within and <br />adjacent to the Specific Plan Area. <br /> <br />Finding: Infeasible <br /> <br />The railroad alternative was not pursued because implementation would produce <br />significant unavoidable traffic congestion and parking impacts and possibly safety and <br />noise impacts that cannot be mitigated at this time. <br /> <br />Alternative 4: Higher Densi~ Alternative <br /> <br />Description <br /> <br />This alternative is similar to the Proposed Specific Plan. but includes the combination of <br />the denser land use Options. The Options represent alternative scenarios for 18 different <br />areas (multiple parcels) within the Specific Plan Area. <br /> <br />Finding: Infeasible <br /> <br />A higher density alternative was not pursued because.analysis revealed that it represented <br />the "worst-case" scenario with regard to environmental impacts. Also, as a mitigated <br /> <br />Downtown Specific Plan EIR Findings and Statement of Overriding Considerations Page 4 of 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.