Laserfiche WebLink
7. That the applicant be responsible for paying its pro rata <br /> share of in-place improvements including any reimbursements <br /> and/or benefit districts that affect the project. <br /> <br />8. That no regrading of lots 17, 18, 19, 30, 40 and 41 be <br /> permitted after the completion of the single family dwelling. <br /> <br />9. That the project CC&R's include requirements that the land <br /> owners of lots 17-19, 1, 35, 36, 42 and 41 shall be <br /> responsible for maintaining the on-site slope banks in a <br /> clean and weed-free manner at all times. <br /> <br />10. That the applicant shall complete necessary hydroseeding of <br /> all cut/fill banks upon completion of rough grading. <br /> <br />11. That the houses to be constructed on Lots 18, 19, 30, 40 and <br /> 4 be limited to a single story in height. In addition, lots <br /> 18 and 19 shall maintain a minimum 20' rear yard setback for <br /> any above ground structures. <br /> <br />12. That the applicant work with staff to revise the pad <br /> elevations for lots 1, 35, 36 41 and 42 be lowered in order <br /> to eliminate the .need for a double fence configuration. <br /> These final pad revisions shall be submitted in conjunction <br /> with the tentative map. <br /> <br />13. That lots 29 and 30 shall utilize a common driveway access. <br /> <br />14. That a final house siting plan and building elevations be <br /> submitted for review in conjunction with the tentative map. <br /> The house siting plan shall be designed to adhere to the site <br /> development standards of the R-1-6500 zoning district. All <br /> rear yards shall have a minimum flat rear yard 20' in depth. <br /> Installation of retaining walls and minor modifications of <br /> the grading plan may be necessary in order to achieve this <br /> rear yard area. <br /> <br />15. That Montevino Drive shall be completed and open for, at a <br /> minimum, construction access prior to the start of any house <br /> foundations. This portion of Montevino Drive shall also be <br /> made available for use by construction worker and <br /> construction delivery vehicles going to the adjacent Amador <br /> Valley Savings and Loan project. <br /> <br />16. That the applicant complete the necessary lot line <br /> adjustment, deeding land to the adjacent Hatsushi property <br /> prior to recordation of the final map. <br /> <br />17. That this development shall be subject to all standard <br /> conditions of development, attached hereto and made part of <br /> <br /> <br />