Laserfiche WebLink
Resolution No. PC-01-46 <br />Page 6 <br /> <br />project developer shall install with the office building expansion signs designating <br />the subject parking spaces which shall state "Electrical Vehicle Chargers Shall Be <br />Provided Upon Request." When charging facilities are installed, the signage shall <br />be changed to state, "Parking for Electrical Vehicles Only, Contact Building <br />Owner for More Information". These changes shall be shown on the building <br />permit set submitted for review and approval by the Planning Director before <br />issuance of a building permit. <br /> <br />26. <br /> <br />Prior to installation of any signs, a comprehensive sign program shall be <br />submitted to the Planning Director for design review and approval. Said sign <br />program shall include the specific details for each sign (i.e. colors, materials, <br />illumination, location, sign, text, etc.) and shall comply with the Hacienda Park <br />Design Guidelines. <br /> <br />27. <br /> <br />The approved building colors and materials for the building shall be indicated on <br />the building permit plan set. Colors and materials shall be consistent with <br />approved colors. <br /> <br />28. <br /> <br />The project developer shall submit a waste management plan to the Building <br />Department prior to issuance of occupancy permit. The plan shall include the <br />estimated composition and quantities of waste to be generated and how the project <br />developer shall recycle at least fifty percent (50%) of the job site construction and <br />demolition waste. During demolition and construction, the project developer shall <br />mark all trash disposal bins "trash materials only" and all recycling bins <br />"recycling materials only". The project developer shall contact Pleasanton <br />Garbage Service for all waste disposal. Only that portion of trash and recycling <br />waste refused by Pleasanton Garbage Service shall be disposed of or diverted by <br />another trash/recycling company. <br /> <br />29. <br /> <br />The project developer shall effectively screen from view all ducts, meters, air <br />conditioning equipment, and any other mechanical equipment, whether on the <br />structure, on the ground, or on the roof, with materials architecturally compatible <br />with the main structure. Screening details shall be shown on the plans submitted <br />for issuance of building permits, the adequacy of which shall be determined by <br />the Planning Director. All required screening shall be provided prior to <br />occupancy. <br /> <br />30. <br /> <br />The project developer shall submit a final lighting plan for the building and the <br />site for the review and approval of the Planning Director prior to issuance of <br />building permits. All lighting shall be consistent with the requirements of the <br />Hacienda Design Guidelines. <br /> <br />31. <br /> <br />All mechanical equipment shall be constructed in such a manner that noise <br />emanating from it will not be perceptible beyond the property plane of the subject <br />property in a normal environment for that zoning district. <br /> <br /> <br />