My WebLink
|
Help
|
About
|
Sign Out
PC 2001-17
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2001
>
PC 2001-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:41 AM
Creation date
3/8/2002 9:50:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/11/2001
DOCUMENT NO
PC 2001-17
DOCUMENT NAME
PUD-03
NOTES
CLAY & SHELLY FRADES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-01-17 <br />Page 17 <br /> <br />1%, the surface runoff shall be carried in a concrete gutter to an acceptable point <br />of discharge. The minimum slope for concrete gutter shall be 0.5%. <br /> <br />64. <br /> <br />A sanitary sewer sampling manhole shall be provided on each of the sanitary <br />sewer lateral from each building, unless otherwise waived by the Director of <br />Building Inspection. <br /> <br />65. <br /> <br />Prior to issuance of a building permit, the developer shall pay the applicable Zone <br />7 and City connection fees and water meter cost for any water meters, including <br />irrigation meters. Additionally, the developer shall pay any applicable Dublin <br />San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />66. <br /> <br />The developer shall pay any and all fees to which the property may be subject <br />prior to the issuance of building permits. The type and amount of the fees shall be <br />those in effect at the time the building permit is issued. <br /> <br />FIRE <br /> <br />67. <br /> <br />All new homes shall be equipped with an automatic residential fire sprinkler <br />system to the satisfaction of the Fire Chief and Director of Building Inspection. <br /> <br />68. All new homes shall be constructed with Class A fire retardant roofing. <br /> <br />69. <br /> <br />The applicants shall maintain the existing Knox Box automatic gate override at <br />the access road gate to the satisfaction of the Fire Chief. <br /> <br />70. <br /> <br />The development shall meet all requirements of the Pleasanton Fire Code <br />(Chapter 20.24 of the Pleasanton Municipal Code). <br /> <br />71. <br /> <br />The developer shall keep the site free of fire hazards from the start of lumber <br />construction until the final inspection. <br /> <br />72. <br /> <br />The developer shall ensure that fire protection facilities including, but not limited <br />to all surface roads, fire hydrants, and a water supply capable of furnishing the <br />required fire flow is installed and serviceable prior to and during the time of <br />construction framing. When alternative methods of protection proposed, this <br />requirement may be waived or modified, subject to review and approval of the <br />Fire Chief. Proposed alternative methods of fire protection shall be submitted in <br />writing to the Fire Chief. Installation of the alternative fire protection methods <br />shall not start without the approval of the Fire Chief. <br /> <br />73. <br /> <br />The Fire Chief and City Engineer shall approve the number, type, and location of <br />any new fire hydrants. <br /> <br />74. <br /> <br />All private streets, driveways, aisles, and alleys designated as fire lanes by the <br />Fire Chief shall be maintained in accordance with Articles 9 and 10 of the <br />Uniform Fire Code which includes tow of vehicles illegally parked on the fire <br />lanes. All roads on the site shall be accessible at all times from the start of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.