119. <br /> <br />120. <br /> <br />121. <br /> <br />122. <br /> <br />Prior to the commencement of any clearing, grading, or excavation, the <br />project developer shall submit a copy of the State Water Resources <br />Control Board Notice of Intent (NOI) for coverage under the State <br />Construction Storm Water General Permit. <br /> <br />All cut and fill slopes shall be revegetated and stabilized after completion <br />of grading before October 15. Hydroseeding shall be accomplished before <br />September 15 and irrigated with a temporary irrigation system to ensure <br />that the grasses are established before October 15. No grading shall occur <br />between October 15 and April 15 unless approved erosion control/storm <br />water quality measures are in place, subject to the approval of the City <br />Engineer/Director of Building Inspection. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br /> <br />The project developer shall submit a construction Best Management <br />Practices (BMP's) program for review and approval by the Planning <br />Director prior to issuance of building and/or grading permits. These <br />BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction <br />site cleanup and control of construction debris shall also be addressed. <br />Failure to comply with the approved construction BMP may result in the <br />issuance of correction notices, citations, or a stop work order. <br /> <br />The project developer is responsible for implementing the following <br />measures during all construction phases of the project: <br /> <br />Gather all construction debris on a regular basis and place it in a <br />dumpster or other container which is emptied or removed on a <br />weekly basis. When appropriate, use tarps on the ground to collect <br />fallen debris or splatters that could contribute to storm water runoff <br />pollution. <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the <br />street pavement and storm drains adjoining the site. Limit <br />construction access routes onto the site and place gravel on them. <br />Do not drive vehicles and equipment off paved or graveled areas <br />during wet weather. Broom sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt <br />from these areas before sweeping. <br />Install filter materials (such as sandbags, filter fabric, etc.) at the <br />storm drain inlet nearest the downstream side of the project site in <br />order to retain any debris or dirt flowing in the storm drain system. <br />Maintain and/or replace filter materials to ensure effectiveness and <br />to prevent street flooding. <br /> <br />P~e28 <br /> <br /> <br />