Laserfiche WebLink
129. The design for the line, grade, and structural sections for the streets serving this develop- <br /> ment shall be subject to final review and approval by the City Engineer. <br /> <br />130. <br /> <br />The project developer shall construct vertical P.C.C. curbs and gutters within this devel- <br />opment unless otherwise approved by the City Engineer. When the sidewalk is adjacent <br />to the curb and gutter, they shall be poured monolithically. <br /> <br />131. <br /> <br />All existing septic tanks or holding tanks shall be removed or sealed, filled, and aban- <br />doned, pursuant to the requirements of the Alameda County Department of Health Ser- <br />vices. <br /> <br />132. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of an encroachment permit. <br /> <br />133. <br /> <br />The project developer shall include erosion control measures on the final grading plan, <br />subject to the approval of the City Engineer. The project developer is responsible for en- <br />suring that the contractor is aware of such measures. All cut and fill slopes shall be <br />revegetated and stabilized as soon as possible after completion of grading, in no case later <br />than October 15. No grading shall occur between October 15 and April 15 unless ap- <br />proved erosion control measures are in place, subject to the approval of the Building De- <br />partment. Such measures shall be maintained until such time as permanent landscaping is <br />in place. <br /> <br />134. The project developer shall submit a dust control plan or procedure as part of the im- <br /> provement plans. <br /> <br />135. <br /> <br />Storm drainage swales, gutters, inlets, outfalls, and channels not located within the area <br />of a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owners or through an association approved <br />by the City. <br /> <br />136. The design of the water supply and sanitary sewer systems shall be subject to the review <br /> and approval of the City Engineer. <br /> <br />137. <br /> <br />Approval of the storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, as applicable, to determine that the system is adequate, con- <br />nects to an approved point of discharge, meets any and all applicable requirements of the <br />Alameda County Flood Control District - Zone 7, meets any and all applicable require- <br />ments of the Federal Emergency Management Flood Hazard Program, the California De- <br />partment ofFish and Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this development. <br /> <br />138. Electric power distribution, gas distribution, communication service, Cable television, <br /> and any required alarm systems shall be installed underground in a joint utility trench. <br /> <br />Page-25- <br /> <br /> <br />