My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
061609
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2009 2:21:52 PM
Creation date
6/10/2009 2:21:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/16/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$250,000 to make ADA improvement to 123 Main Street and to expand the southern portion of <br /> the building to add offices. Funding is also available for the redesign and construction of 200 Old <br /> Bernal service counters. <br /> A total estimated contribution to the CIPR of $4,315 000 occurring during 2011 -12 and 2112-13 <br /> Water and Sewer <br /> A total of $1,500,000 is allocated for annual sanitary sewer main replacements and <br /> Improvements and $1,760,000 for annual water main replacements. <br /> $1,650,000 for completion of the S -6 sewer pump station located near West Las Positas and 1- <br /> 680. This amount is in addition to a reserve of $2,250,000 for this project. Total project is <br /> estimated at $3,900,000. <br /> $150,000 in FY2010 -11 for the Stoneridge Mall Sewer by -pass pipeline to allow for flexibility of <br /> controlling heavy sewer flows from Stoneridge Mall. <br /> A total of $200,000 over the four years of the CIP for annual water pump and motor repairs. <br /> Debt Service <br /> While not included as direct expenditures, this CIP includes transfers to pay for existing debt services as <br /> follows: <br /> 2003 Certificates of Participation for the Senior Center and Operations Service Center with C1P <br /> transfers of approximately $400,000 annually. These COP's will be fully paid in 2011. <br /> 2004 Certificates of Participation for the Support Services and Parks buildings at the Operations <br /> Service Center with CIP transfers of approximately $390,000 annually. These COP's will be <br /> fully paid in 2014. <br /> 2004 Water Refunding Revenue Bonds for the water service building at the Operations Service <br /> Center with CIP transfers of approximately $119,000 annually. These bonds will be fully paid in <br /> 2014. <br /> 2004 Sewer Revenue Refunding Bonds for the sewer service building at the Operations Service <br /> Center with CIP transfers of approximately $122,000 annually. These bonds will be fully paid in <br /> 2014. <br /> 2002 Sewer Revenue Refunding Bonds for the Cross town Interceptor project with CIP transfers <br /> of approximately 5192,000 annually. These bonds will be fully paid in September 2009. <br /> Debt service for the Callippe Golf Course is included as part of the operating budget. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.