My WebLink
|
Help
|
About
|
Sign Out
2380
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:14:38 PM
Creation date
6/9/2009 12:32:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/26/1983
DOCUMENT NO
2380
DOCUMENT NAME
GP-83-1
NOTES
CITY OF PLEASANTON
NOTES 2
GROWTH MANAGEMENT ELEMENT
NOTES 3
HACIENDA BUSINESS PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IX. Biology. <br />A. Significant Effect. Loss of riparian habitat along <br />Tassajara Creek and half of Arroyo de la Laguna. <br />a.1 Finding. The mitigation measure incorporated <br />into the Project will substantially lessen the <br />effect. <br />a.2 Fact. Condition No. 68 requires Developer to <br />meet all requirements of the California Depart- <br />ment of Fish and Game. <br />a.3 Fact. Developer has permit from California <br />Department of Fish and Game that requires a <br />shaded, low -flow channel and revegetation. <br />B. Significant Effect. Alteration of the Project area's <br />wildlife and vegetation habitat would occur. <br />b.1 Finding. The effect is unavoidable. The only <br />possible mitigation measure is adoption of the <br />"No Project Alternative" which is infeasible. <br />b.2 Fact. See Section XII (for infeasibility of <br />Alternatives). <br />C. Significant Effect. Loss of prime and near prime <br />agriculture soils to urbanization. <br />c.1 Finding. The mitigation measure of Project <br />phasing is infeasible. However, short -term <br />effects are lessened to the extent feasible. <br />c.2 Fact. All infrastructure for the entire site <br />has been completed making phasing for farming <br />impossible. The Developer is engaging in dry <br />farming of lots not subject to immediate <br />construction. <br />c.3 Finding. Although the No Project Alternative <br />could partially mitigate the effect, the No <br />Project Alternative is infeasible. <br />c.4 Fact. See Section XII (for infeasibility of <br />Alternatives). <br />D. Significant Effect. Placement of fill from Arroyo de <br />la Laguna on agricultural lands. <br />17. <br />
The URL can be used to link to this page
Your browser does not support the video tag.