My WebLink
|
Help
|
About
|
Sign Out
2380
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:14:38 PM
Creation date
6/9/2009 12:32:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/26/1983
DOCUMENT NO
2380
DOCUMENT NAME
GP-83-1
NOTES
CITY OF PLEASANTON
NOTES 2
GROWTH MANAGEMENT ELEMENT
NOTES 3
HACIENDA BUSINESS PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Significant Effect. Generation of total suspended <br />particulates potentially exceeding standards during <br />construction. <br />c.1 Finding. The mitigation measure to reduce <br />generation of total suspended particulates has <br />been incorporated into the Project and will <br />substantially lessen the effect. <br />c.2 Fact. Condition No. 87 requires Developer to <br />submit a dust control plan to City for <br />approval. City has approved the Developer's <br />dust control plan, and major site construction <br />work involving earth moving is completed. <br />c.3 Finding. The No Project Alternative could <br />partially mitigate the significant effect if <br />development of the Project did not proceed <br />beyond the buildings already under construc- <br />tion. The No Project Alternative is economi- <br />cally infeasible and unnecessary because the <br />significant effect has been substantially <br />lessened. <br />c.4 Fact. See Section XII (for infeasibility of <br />Alternatives). <br />c.5 Fact. See Section III.c.2 (Dust Control Plan). <br />D. Significant Effect. Generation of total suspended <br />particulates following construction. <br />d.1 Finding. The mitigation measures incorporated <br />into the Project to lessen traffic congestion <br />will substantially lessen the effect. <br />d.2 Fact. The Traffic Conditions will cause a <br />reduction in vehicle miles travelled which will, <br />in turn, reduce the generation of total <br />suspended particulates. <br />d.3 Finding. The Reduced Intensity of Development <br />Alternative, No Project Alternative, Increased <br />Residential Capacity Alternative, Partial Ap- <br />proval Alternative or Mixed Use Alternative <br />could partially mitigate the potential effect. <br />However, each of these Alternatives is infeasi- <br />ble and unnecessary as Traffic Conditions will <br />substantially lessen the effect. <br />7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.