My WebLink
|
Help
|
About
|
Sign Out
2363
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:13:22 PM
Creation date
6/9/2009 11:47:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/28/1983
DOCUMENT NO
2363
DOCUMENT NAME
PUD-83-18
NOTES
MORRISON HOMES
NOTES 2
206 RESIDENTIAL SUBD
NOTES 3
NE SANTA RITA & VALLEY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />PLANNING COMMISSION RESOLUTION NO. 2363 <br />CASE PUD- 83 -18, September 28, 1983 <br />41. That approval of the water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long -range <br />requirements for supplying water in this area. <br />42 That the developer comply with any and all <br />applicable requirements of the cross connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />43. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />44, That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />45. That approval for the number, type and location <br />of fire hydrants be withheld pending final design <br />review by the Fire Marshal, and final review by <br />the City Engineer, <br />46. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long -range require <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />47, That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />4 That if a sanitary sewer lift station is installed <br />for use by the development and if it is accepted by <br />the City for maintenance and operation, an agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.