My WebLink
|
Help
|
About
|
Sign Out
2341
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:12:08 PM
Creation date
6/9/2009 9:17:55 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/27/1983
DOCUMENT NO
2341
DOCUMENT NAME
UP-83-13
NOTES
GUS ENTERPRISES & PRUDENTIAL INSURANCE
NOTES 2
105,998 SQ FT HOTEL
NOTES 3
NE HOPYARD & GIBRALTAR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
27. That the developer acknowledges that the City of Pleasanton <br />does not guarantee the availability of sufficient sewer <br />capacity to serve this development by the approval of <br />this case, and that the developer agrees and acknowledges <br />that building permit approval may be withheld if sewer <br />capacity is found by the City not to be available. <br />28. That all buildings and /or structures must comply with all <br />codes and ordinances in effect at the time required permits <br />are issued by the Building Division. <br />29. That the location of any pad mounted transformers shall <br />be subject to approval by the Planning Division prior to <br />issuance of a building permit. Generally speaking such <br />transformers shall not be located between any street and <br />the front of a building. <br />30. That the developer submit a site development plan in <br />accordance with the Survey Ordinance (Article 3, Chapter 3, <br />Title II) and that these plans be approved by the City <br />Engineer prior to the issuance of a building permit. <br />31. That the site development plan include all required <br />information to design and construct site, grading, <br />paving and drainage. <br />Specific items to be indicated on the site development <br />plan necessary to construct storm, sewer and water <br />systems are: <br />a. Type of pipes to be used (storm, sewer, water); <br />b. Length of pipes in linear feet (storm, sewer, water); <br />c. Slopes of pipes (storm and sewer); <br />d. Invert elevations at each inlet or junction <br />structure (storm and sewer); <br />e. Horizontal control necessary to set relationships <br />between buildings, parking, curb and gutter.(storm, <br />sewer and water); <br />f. Show top of pipe and bottom of pipe elevations where any <br />pipes cross under or over one another. <br />g. Differentiate between public and private systems. <br />Landscape areas, parking stalls, driveway aisles, <br />buildings, curbs and gutters shall have horizontal <br />control dimensioning indicated on site development <br />plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.