My WebLink
|
Help
|
About
|
Sign Out
ORD 1458
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1401 - 1500
>
ORD 1458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2006 4:52:38 PM
Creation date
3/11/1999 7:32:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1458
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />bridge across the Arroyo de la Laguna, as approved herein. <br />Should the developer be unable to acquire said land, the City <br />may use its power of eminent domain. The applicant shall <br />reimburse the City for any cost incurred in the land <br />acquisition. No more than 60 dwelling units in Land Unit B <br />shall be allowed to be occupied until the new bridge is <br />completed and open for use. However, if the City Traffic <br />Engineer feels that traffic safety in the vicinity of the <br />intersection of Bernal Avenue and the Unit B entry is being <br />compromised at any time during the project buildout, measures <br />shall be taken to the satisfaction of the city Engineer to <br />address the safety problems. <br /> <br />9. The developer may enter into a reimbursement agreement with <br />the City to recover the costs associated with the acquisition <br />of property to the south (San Francisco Water District) <br />relative to the construction of the bridge. <br /> <br />10. That the final map exhibit shall reflect the addition of a <br />short segment of sidewalk linking the interior street <br />sidewalk with the Bernal/Foothill intersection through the <br />wrought iron fence, and the extension of the sidewalk along <br />the Bernal Avenue frontage of Unit B easterly to the I-680 <br />underpass. The developer shall be responsible for installing <br />these improvements in conjunction with the related street <br />improvements at the first phase of development on the site. <br /> <br />11. That the applicant shall install the bridge and street <br />improvements along Bernal Avenue in conformance with the <br />conditions of the master POD approval. The applicant's pro- <br />rata share shall be considered to be the improvements <br />depicted in "Alternative D: Interim Alignment", on file with <br />the Planning Department. These improvements shall be <br />depicted, in addition to the "Alternative D: Ultimate <br />Alignment" improvements, on the final map for the project. <br /> <br />12. That the developer shall work with the City toward mutual <br />agreement on a design for a traffic light standard for the <br />Bernal/Foothill intersection which achieves the required <br />lighting and traffic control function, yet retains the rural, <br />"old-style- ambiance de. ired for the area to the maximum <br />extent possible. <br /> <br />13. That, except as modified above, all conditions of the <br />original master POD approval (PUD-89-5i Ordinance No. 1408) <br />shall remain in full torce and effect. <br /> <br />14. That this development is subject to all of the "Standard <br />Conditions of Development-, attached hereto and made part of <br />this case by reference, except Conditions No.7, 9, 14, 16, <br />25, 29, 31, 50, and 55. <br />
The URL can be used to link to this page
Your browser does not support the video tag.