Laserfiche WebLink
wall/fence design which is satisfactory in design with that <br /> property owner. The design of this wall shall be subject to <br /> the review and approval by the Planning Commission prior to <br /> the approval of the tentative-map. <br /> <br /> 44. The developer shall apply for and receive all necessary <br /> permits/licenses from the Union Pacific Railroad and Santa Fe <br /> Pipeline. <br /> <br /> 45. The development plan shall be subject to all of the attached <br /> Standard Conditions of Development except nos. 7, 9, and 14. <br /> <br /> 46. The City shall withhold building permits for this project if, <br /> at the time building permits are applied for, mandatory water <br /> rationing is in effect, unless the City has adopted a water <br /> offset program, and unless-the developer is participating in <br /> the program. Notwithstanding the developerms participation in <br /> said program, the City may withhold building permits if the <br /> City determines that sufficient water is not available at the <br /> time building. permits for the project are applied for. <br /> <br />Page 9 <br /> <br /> <br />