My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· ® A program of working with adjacent jurisdictions to <br /> help implement the development of a parallel. <br /> arterial system that can help relieve the freeway <br /> network. <br /> <br /> e® Continued implementation and monitoring of TSM <br /> measures to reduce overall traffic, and especially <br /> peak hour traffic. The program requires most <br /> businesses to prepare an annual survey to assess <br /> TSM progress, and requires medium and large <br /> employers to implement TSM measures. There are <br /> penalties associates with noncompliance with the <br /> program. <br /> <br /> ee Support for higher density land uses with immediate <br /> access to transit systems. <br /> <br /> Finding: Mitigation Measures of the Pleasanton General Plan <br /> EIR Feasible and Required <br /> <br /> The City adopted the foregoing policy measures as mitigations <br /> in the Pleasanton General' Plan. ~ <br /> <br />Regional Road Network <br /> <br /> Impacts Cumulative traffic congestion on regional road <br /> network <br /> <br /> The City finds that cumulative development in Pleasanton and <br /> the region (with or without the project) would result in <br /> regional traffic increases causing severe congestion on 1-580 <br /> and 1-680 backing up into the City of Pleasanton. This is a <br /> significant impact (Draft EIR, page 12-2). <br /> <br /> Proposed Mitigation Measures of the EIR: Implement Mitigation <br /> in Pleasanton General Plan <br /> <br /> The EIR identified the following recommended measures to <br /> contribute to the mitigation of this cumulative traffic impact <br /> on the regional road network (Draft EIR, page 12-2). <br /> <br /> · Pages 46 and 47 in Pleasanton General Plan EIR: <br /> <br /> ee Improvement district to develop necessary <br /> infrastructure including freeway interchanges and <br /> road improvements. <br /> <br /> · · Policies of the Pleasanton General Plan to provide <br /> more housing in Pleasanton, including affordable <br /> housing. <br /> <br /> 25 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.