Laserfiche WebLink
Finding: Mitigation Measure 8-17 Feasible and Required <br /> <br /> The City finds that it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigation 8-17 into the project design. The applicant and <br /> successors in interest shall incorporate such downstream flooding <br /> and sedimentation impact reduction provisions into project design <br /> as a "Condition of Approval" to the project.. <br /> <br />Groundwater <br /> <br /> Impact: Potential for unstable ground conditions from groundwater <br /> <br /> The City finds that improper placement of fill, grading which seals <br /> off or exposes water bearing units, and prolonged or excessive <br /> landscape irrigation may increase the potential for unstable ground <br /> conditions. This is a potential significant impact (Draft EIR, <br /> page 8-19). <br /> <br /> Proposed Mitigation Measures of the EIR <br /> The EIR identified the following mitigation measures which w6hld <br /> substantially avoid this impact. <br /> <br /> 8-19 Control drainage from springs or streams and from fills (Draft <br /> EIR, page 8-19). Said mitigation measure was considered and <br /> adopted with any pertinent changes in Condition 8-19, Exhibit <br /> "B" of the City Council staff report dated June 16, 1992. <br /> <br /> 8-20 Control drainage of cut slopes (Draft EIR, page 8-19). Said <br /> mitigation measure was considered and adopted with any <br /> pertinent changes in Condition 8-20, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br /> 8-21 Evaluate effects of surface drainage system on groundwater <br /> regime (Draft EIR, page 8-20). Said mitigation measure was <br /> considered and adopted with any pertinent changes in Condition <br /> 8-21, Exhibit "B" of the City Council staff report dated June <br /> 16, 1992. <br /> <br /> Findings Mitigation Measures 8-19 through 8-22 Feasible and <br /> Required <br /> <br /> The. City finds that it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigations 8-19 through 8-22 into the project design. The <br /> applicant and successors in interest shall incorporate such <br /> groundwater impact reduction provisions into project design as a <br /> ,,Condition of Approval" to the project. <br /> <br /> 21 <br /> <br /> <br />