Laserfiche WebLink
MitigatiOn Measure 9-20: Expansive Soil: COnStruCtiOn Pr0~ures ' <br /> <br /> What: Follow plans and provide inspection during construction <br /> Who: Developer/geotechnical engineering consultants and contractors <br /> When: Conditions 32 through 43 of the PUD approval <br /> Completion: End of project grading <br /> Who Verities: Public Works Department <br /> <br /> Mitigation Measure 9-21: Seismic Hazard Analysis <br /> <br /> What: Evaluation of seismic hazards <br /> Who: Developer/geotechnical consultants <br /> When: Condition 32 of the PUD approval <br /> Completion: Tentative map approval <br /> Who Verities: Public Works Department <br /> <br /> Mitigation Measures 9-22: Earthquake ReSistant Design <br /> <br /> What: Design of structures, utilities and other improvements to resist <br /> earthquakes <br />· Who: Developer/geotechnical and engineering consultants <br /> When: Conditions 32 and 69 of the PUD approval <br /> Completion: Tentative map approval (infrastructure improvements); completion of <br /> construction (structures) <br /> Who Verities: Public Works Department <br /> <br /> Mitigation Measure 9-23: Drainage Plan <br /> <br /> What: Provide a detailed drainage plan and calculations <br /> Who: Developer/engineer <br /> When: Condition 32 of the PUD approval <br /> Completion: Tentative map approval <br /> Who Verities: Public Works Department <br /> <br /> Mitigation Measure 9-24; I--Iydrauli~ ImprOvements <br /> <br /> What: Implement drainage improvements <br /> Who: Developer/engineer <br /> When: Condition 55 of the PUD approval <br /> Completion: End of construction period <br /> Who Verities: Public Works Department <br /> <br /> 11 <br /> <br /> <br />