My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation MeasureS 9-2 through 9-9: Slope Stability_ <br /> <br />What: Identify unstable slope conditions and provide recommendations for <br /> stabilization; construction observation <br />Who: Developer/geotechnical engineering and civil engineering consultants <br />When: Conditions 32 and 35 of the PUD approval <br />Completion: Approval of tentative map (plan); end of construction period <br /> (installation) <br />Who verities: Public Works Department <br /> <br />Mitigation Measures 9-10 through 9-19: ErOsiOn Control <br /> <br />What: Design and installation of erosion control measures <br />Who: Developer/civil and geotechnical engineering consultants <br />When: Condition 33 of the.PUD approval <br />Completion: Tentative map approval (plans); end of construction (installation) <br />Who Verities: Public Works Department <br /> <br />Mitigation Measures 9-14 through 9-17: Fill Settlement <br /> <br />What: Analyze fill settlement potential, provide fill design recommendations, <br /> and monitor fill placement for quality of construction <br />Who: Developer/geotechnical and civil engineering consultants <br />When: Condition 32 of the PUD approval <br />Completion: Prior to issuance of tentative map (plans); four months minimum after <br /> fill placement (construction) <br />Who Verities: Public Works Department <br /> <br />Mitigation Measure 9-18: Expansive Soil Evaluation <br /> <br />What: Assessment of earth material expansion potential <br />Who: Developer/geotechnical engineering consultants <br />When: Condition 32 of the PUD approval <br />Completion: Prior to issuance of building permits (plan); end of grading <br /> (construction) <br />Who Verities: Public Works Department <br /> <br />Mitigation Measure 9-19: Ex_~ansive S0il: Surface Drainage ProviSiOns <br /> <br />What: Meet standards for surface drainage <br />Who: Developer/geotechnical engineering consultants and contractors <br />When: Conditions 8, 13, 32, 33, and 37 of the PUD approval <br />Completion: Grading plan approval (plans); before issuance of occupancy permit <br /> (monitoring) <br />Who Verities: Public Works Department <br /> <br /> 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.