My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stabilize or avoid soft creep areas. Designate setback zones where unstable features cann6~ <br /> be mitigated otherwise. FEIR pages 9-11 through 9-13. <br /> <br /> Finding: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The detailed geotechnical investigation will disclose additional <br /> areas which may be susceptible to slope instability. Special techniques such as controlling <br /> water movement with ditches and through the orientation and location of cuts and fill <br /> design will improve slope stability. <br /> <br /> IMPACT 9C: Accelerated erosion could create unstable conditions, increase sediment in surface <br /> ranoff, and cause erosion gu_iHes. FEIR pages 9-13, 9-14. <br /> <br /> Miti_ntion Measures 9-1.9-10 through 9-!3. Provide an erosion control plan as pan of <br /> a detailed geotechnical investigation. The erosion control plan shall include measures to <br /> prevent erosion of existing drainageways and measures for revegetation of graded soil <br />· surfaces. Additional mitigations require erosion control before and during grading to <br /> control erosion. Temporary structures shall provide erosion control during storm runoff <br /> and permanent measures shall provide long-term ewsion control. Reduce areas of soil <br /> disturbance. FEIR page 9-14, 9-15. <br /> <br /> ~.aing: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final FIR. <br /> <br /> Rationale for Finding: The erosion control plan will insure that erosion is minimized, <br /> through use of techniques to provide both short- and long-term erosion control. <br /> <br /> DIFFERENTIAL FILL SETTLEMENT <br /> <br /> IMPACT 9D: Filling on the site is proposed. This could result in significant settlement. <br /> Differential settlement could occur, causing damage to building foundations and utility conduits. <br /> FEIR pages 9-15. <br /> <br /> Mitigation Measures 9-1.9-14 through 9-17: Fill settlement shall be evaluated as pan of <br /> a detailed geotechnical investigation, with techniques used to minimize settlement risks for <br /> structures, roads and utilities. Monitor settlement of deep fills. FFJR pages 9-15, 9-16. <br /> <br /> F_iBaiag: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> 14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.