My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R~tionale for Finding: The Open Space Management Plan will define the improvement~ <br /> contemplamd for each area, phasing of the improvements, and management and <br /> maintenance for each area. <br /> <br />PEDESTRIAN TRAILS / BICYCLE CIRCULATION <br /> <br />IMPACT 7.4C: Without proper arrangement for planning and maintenance of a pedestrian trail <br />network, there could be a potential significant advers~ impact, du~ to parking, maintenance and <br />security problems. EIR page 7-17. <br /> <br /> Mitigation Measure 7.4-3: Provide a detailed pedestrian and bicycle circulation plan to <br /> the City, with information on security, maintenance, and de.sign. FEIR page 7-18, 7-19. <br /> <br /> Eiacli~: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final ErR. <br /> <br /> Rationale for Findinto: The new information on security, maintenance, and design will <br /> resolve the potential parking, maintenance and security problems. <br /> <br />CONSTRUCTION NOISE <br /> <br />IMPACT 8A: Construction will generate significant noig for adjacent residents in the area. <br /> <br /> Mitigation Measure 8-1: Restrict hours of equipment operation. Phag construction <br /> activities to minimize duration of noise exposure for neighbors. FEIR page 8-3. <br /> <br /> Ehlahlg: Changes or alterations have been required in, or incorporated into the .project <br /> that avoid or substantially lessen the significant effect identified in the Final <br /> <br /> Riltionale for Finding: Noise-efficient equipment will decrease construction noise impacts. <br /> Phased construction will allow intensive grading and other operations to be done at places <br /> and at times when there are less noise-sensitive uses in place. <br /> <br />SLOPE STABILITY <br /> <br />IMPACT 9B: The hillsides in the Planning Area are prone to landslide activity and soft creep. <br />Cuts and fills are planned which could aggravate slope instability. FEIR page 9-11. <br /> <br /> Miriitation Measures 9-1 throu~[{ 9-9: Pro~'id';~ supple/:ne~ieary geotechnical investigation <br /> to provide supplementary identification and accurate mapping of all landslides, debris flow <br /> areas, and soil creep areas. Specific recommendations to stabilize landslides and unstable <br /> slopes shall be related to the proposed development. Design grading so that slope stability <br /> is improved. Control water movement with ditches and subdrainage. Identify and <br /> <br /> 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.