My WebLink
|
Help
|
About
|
Sign Out
ORD 1691
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 12:14:42 PM
Creation date
3/10/1999 6:24:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1691
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Trash and refuse cans shall be stored in the unit's garage except when brought outside <br /> for collection. The trash/refuse can be stored outside'the garage from 12:00 p.m. the <br /> day preceding collection and 8:00 p.m. the day of collection. <br /> g. The homeowner' s association shall be responsible for the costs associated with repair <br /> or replacement of the special paving materials used in the motorcourts if the City of <br /> Pleasanton is required to remove this paving in order to service the underground <br /> utilities. <br /> <br /> h. The homeowners association shall be responsible for maintaining the landscaped por- <br /> tions of the area of the An'oyo Del Valle located between the top-of-bank and the ar- <br /> royo trail for a three-year period of time after installation of landscaping. ----' <br /> <br />25. With submittal of the tentative map, the developer shall provide preliminary improvement <br /> plans for the g' 0" wide, paved bicycle/pedestrian trail to be located in the Arroyo ~)el <br /> Valle; bank stabilization work to be done by the project developer; and repair of the <br /> "washed-out" portion of the Arroyo Del Valle between the Union Pacific railroad and Main <br /> Street vehicular bridges. Final improvement plans shall be submitted with the final map. <br /> With review of the tentative map, the construction schedule for the arroyo work shall be <br /> determined. ' <br /> <br />26. With recordation of the final map, the developer shall dedicate to the City a Public Service <br /> Easement (P.S.E.) over all private streets and motorcourts. Except for the side of the pri- <br /> vate street alongside the Arroyo Del Valle, the PSE shall extend 5' 0" outside the <br /> motorcourt/private street area. All PSE areas shall be shown on the tentative map. <br /> <br />27. With recordation of the final map, the developer shall dedicate to the Alameda Water Qual- <br /> ity and Flood Control District Zone 7 the portions of the Arroyo Del Valle located on the <br /> project site south of the top-of-bank line. At this time, the City of Pleasanton shall accept a <br /> recreation easement from Zone 7. <br /> <br /> 28. With recordation of the final map, the developer shall grant to the Alameda Water Quality <br /> and Flood Control District Zone 7 an ingress/egress easement over the private street and <br /> sidewalk and the area between the private street/sidewalk and the top-of-bank of the Arroyo <br /> Del Valle. The easement shall be submitted to the City Attorney for review and approval <br /> before recordation. <br /> <br /> 29. All work to be done within the Arroyo Del Valle requires an encroachment permit issued <br /> by the Alameda Water Quality and Flood Control District Zone 7 and a streambed altera- <br /> tion permit issued by the California State Department of Fish and Game. Said permits shall <br /> be secured before project construction begins. <br /> <br /> 30. All site improvements and house construction activities shall be limited to the: ,as of 8:00 <br /> a.m. to 5:00 p.m., Monday through Saturday. All consauction equipment must meet DMV <br /> noise standards and shall be equipped with muffling devices. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.