Laserfiche WebLink
" Urban Clean Water Run-Off <br /> <br /> 66. The applicant shall submit a construction Best Management Practices (BMP's) program <br /> for review and approval by the Planning Director prior to issuance of building and/or <br /> Fading permits. These BMP's shall be implemented by the general contractor and all <br /> subcontractors and suppliers of materials and equipment. Construction site cleanup and <br /> control of comtruction debris shall also be addressed. Failure to comply with the <br /> approved construction BMP may result in the issuance of correction notices, citations. or <br /> a stop work order. <br /> <br /> 67. The applicant is responsible for implementing the following measures during all <br /> construction phases of the project: <br /> <br /> a. Gather all construction debris on a regular basis and place it in a dumpster or <br /> other container which is emptied or removed an a weekly basis. When appropriate, use <br /> tarps on the ground to collect fallen debris or splatters that could contribute to storm <br /> water nmoff pollution. <br /> <br /> b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site. Limit consu'uction access routes onto the site and <br />_ place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br /> during wet weather. Broom sweep the street pavement adjoining the project site on a <br /> daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br /> c. Irkstall filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt flowing <br /> in-the storm drain system. Maintain and/or replace filter materials to ensure effectiveness <br /> and to prevent street flooding. <br /> <br /> d. Creme a contained and covered area on the site for the storage of bags, cement, <br /> paints, oils, fertilizers, pestiCides, or other materials used on the site that have the <br /> potential of being discharged into the storm drain system through being windblown or in <br /> the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. <br /> <br /> f. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains. <br /> <br /> <br />