My WebLink
|
Help
|
About
|
Sign Out
ORD 1648
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2003 12:55:52 PM
Creation date
3/9/1999 7:09:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1648
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79. The design of the water supply and sanitary sewer systems shall be subject to the review <br /> and approval of the City Engineer. <br /> <br />80. Approval of the storm drainage system shall be subject to the review and approval of the <br /> City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br /> approved point of discharge, meets any and all applicable requirements of the Alameda <br /> County Flood Control District - Zone 7, meets any and all applicable requirements of the <br /> Federal Emergency Management Flood Hazard Program, the California Department of <br /> Fish and Game, and meets the immediate and long-range requirements of this development <br /> and all upstream areas intended to be drained through this development. <br /> <br />81. Electric power distribution, gas distribution, communication service, Cable television, and <br /> any required alarm systems shall be installed underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer or Director of Building Inspection <br /> for on-site. <br /> <br />82. The applicant shall be responsible for the installation of the street lighting system serving <br /> the development. Approval for the number, location, and type of electrollers shall be <br /> subject to the review and approval of the City Engineer. <br /> <br />83. The applicant shall submit detailed landscape and irrigation plans as part of the <br /> improvement plans. These plans should include, where applicable, a street tree planting <br /> plan and landscape plans for medians, buffer strips, and any right-of-way landscape areas. <br /> The irrigation plan shall provide for automatic controls. <br /> <br />84. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br /> City Engineer. <br /> <br />85. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site. <br /> <br />86. The applicant shall install at least one street tree per lot, three per comer lot (one in the <br /> front yard and two along the street side yards), subject to the approval of the City <br /> Engineer. <br /> <br />87. Street curb to curb width shall be 32 feet with a 4 foot planter and 4 foot walkway (48 <br /> foot right-of-way). A public service easement shall be provided which extends 8 feet <br /> behind the sidewalk. <br /> <br />PUD-94-04 - City Council Conditions Of Approval - Page 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.