My WebLink
|
Help
|
About
|
Sign Out
ORD 1721
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 7:04:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1721
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br /> storm drain. <br /> <br /> g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br /> discharge wash water into street gutters or drains. <br /> <br /> h.) Construction access routes shall be limited to those approved by the City Engineer or <br /> Building Inspector and shall be shown on the approved grading plan. <br /> <br />89. The applicants shall work with City staff to design a portion of the on-site storm drain <br /> system to drain over the lawn area of the 3.0 acre park site. Said design shall be subject <br /> to the review and approval of the City Engineer, Parks and Community Services Director, <br /> and Planning Director prior to issuance of an on-site permit for the project. For those <br /> areas of the site that do not drain to the park site, the applicant shall install structural <br /> control(s), such as an oil/water separator, sand filter, or approved equal (e.g., Dura Drain <br /> Fossil FilterTM) in the parking lot to intercept and pretreat storm water prior to reaching <br /> the storm drain. The design, locations, and a schedule for maintaining the separator shall <br /> be submitted to the City Engineer/Director of Building Inspection for review and <br /> approval prior to issuance of building permits. The structural control shall be cleaned at <br /> least twice a year: once immediately prior to October 1 and once in January. The <br /> applicant shall enter into a maintenance agreement for the oil/water separator with the <br /> City. <br /> <br />90. The car wash areas shall be covered and shall drain through an oil/water separator to the <br /> sanitary sewer, subject to approval by DSRSD, or collected in a holding tank for removal <br /> by a disposal and recycling service. If the area is connected to the sanitary sewer, a sign <br /> shall be posted prohibiting the dumping of hazardous materials. Recycling of water is <br /> encouraged. No other area shall drain to the car wash area; a berm shall be installed to <br /> prevent such drainage if found necessary by the City Engineer/Director of Building <br /> Inspection. <br /> <br />91. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br /> month and shall prevent the accumulation of litter and debris on the site. Comers and <br /> hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br /> pressure washed, debris must be trapped and collected to prevent entry into the storm <br /> drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br /> agent or degreaser is used, wash water must be collected and discharged to the sanitary <br /> sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />92. All trash enclosure areas shall be completely covered. An area drain shall be installed in <br /> the enclosure area which connects to the sanitary sewer. A structural control such as an <br /> oil/water separator or sand filter shall be provided. No other area shall drain into the <br /> trash enclosure; a berm shall be installed to prevent such drainage if found necessary by <br /> the City Engineer/Director of Building Inspection. A sign shall be posted prohibiting the <br /> dumping of hazardous materials into the sanitary sewer. The applicant shall notify the <br /> <br />Conditions of Approval PUD-8 ! -30-71D <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.