My WebLink
|
Help
|
About
|
Sign Out
ORD 1721
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 7:04:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1721
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
84. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br /> City Engineer. <br /> <br />85. The applieant's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site. <br /> <br />86. The applicant shall comply with the City's Storm Water Management and Discharge <br /> Control Ordinance. <br /> <br />87. The applicant shall submit a construction Best Management Practice (BMP) program for <br /> review and approval by the Planning Director prior to issuance of any building and/or <br /> grading permits. These BMP's shall be implemented by the general contractor and all <br /> subcontractors and suppliers of materials and equipment. Construction site cleanup and <br /> control of construction debris shall also be addressed in this program. Failure to comply <br /> with the approved construction BMP may result in the issuance of correction notices, <br /> citations, or a project stop work order. <br /> <br />88. The applicant is responsible for implementing the following measures during all <br /> construction phases of the subject project: <br /> <br /> a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br /> container which is emptied or removed on a weekly basis. When appropriate, use tarps <br /> on the ground to collect fallen debris or splatters that could contribute to storm water <br /> pollution. <br /> <br /> b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br /> and storm drains adjoining the project site. During wet weather avoid driving vehicles <br /> off paved areas. <br /> <br /> c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br /> Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br /> d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt flowing <br /> into the City storm drain system. Filter materials shall be maintained and/or replaced as <br /> necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br /> particles in the trash. <br /> <br /> e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br /> flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br /> have the potential for being discharged to the storm drain system through being <br /> windblown or in the event of a material spill. <br /> <br /> Conditions of Approval PUD-81-30-71D <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.