Laserfiche WebLink
-Intent (NOI) for coverage under the State Construction Storm Water General Per- <br />mit. <br /> <br />91. <br /> <br />The project developer shall include erosion control/storm water quality measures <br />on the final grading plan which shall specifically address measures to prevent soil, <br />dirt, and debris fi.om entering the storm drain system. Such measures may include, <br />but' are not limited to, hydroseeding, hay bales, sandbags, and siltation fences and <br />are subject to the review and approval of the City Engineer/Director of Building <br />Inspection. If no grading plan is required, necessary erosion control/storm water <br />quality measures shall be shown on the site plan submitted for an on-site permit, <br />subject to the review and approval of the Director of Building Inspection. The <br />project developer is responsible for ensuring that the contractor is aware of and im- <br />plements such measures. <br /> <br />92. <br /> <br />The project developer shall submit a construction Best Management Practices <br />(BMP's) program for review and approval by the Planning Director prior to issu- <br />ance of building and/or grading permits. These BMP's shall be implemented by <br />the general contractor and all subcontractors and suppliers of materials and equip- <br />ment. Construction site cleanup and control of construction debris shall also be <br />addressed. Failure to comply with the approved construction BMP may result in <br />the issuance of correction notices, citations, or a stop work order. <br /> <br />93. <br /> <br />The project developer is responsible for implementing the following measures dur- <br />ing all construction phases of the project: <br /> <br />ao <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When ap- <br />propriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />bo <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep the <br />street pavement adjoining the project site on a daily basis. Scrape caked-on <br />mud and dirt fi'om these areas before sweeping. <br /> <br />Co <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any de- <br /> <br />PUD-91-11-3M <br />Final Conditions of Approval <br /> <br />May 22, 1998 <br />Page 15 of 16 <br /> <br /> <br />