69. Wh~re utility pipes will be constructed on steep natural downslopes, construct periodic <br /> concrete cut-off collars along the pipeline to prevent subsurface water fi'om flowing <br /> uninterrupted down the trench around the pipe. A subdrain shall be installed at the cut-off <br /> collars and connected to the storm drain system. <br />70. All roads and utility lines' which cross the fault shall be designed and constructed in a <br /> manner that recognizes potential surface displacement. Water, gas, and electric lines <br /> shall be equipped with automatic shut-off devices. <br /> : <br /> <br />71. The applicant shall pay a pro-ram share, as determined by the City Engineer, of the cost <br /> of the traffic mitigations necessary to retain LOS D at the intersection of Foothill Road <br /> and Dublin Canyon Road as required of Wells Fargo Bank (PUD-81-22-6M). <br /> <br />Miscellaneous <br /> <br />72. If archeological materials are uncovered during grading, trenching, or other on-site <br /> excavation, all work on site shall be stopped and the City immediately notified. The <br /> county coroner and the Native American Heritage Commission shall also be notified and <br /> procedures followed as required in Appendix K of the California Environmental Quality <br /> Act. A similar note shall appear on the improvement plans. <br /> <br />73. The applicant shall fund school facilities necessary to off-set this project's reasonably <br /> related impacts on the long-term needs for expanded school facilities to serve new <br /> development in Pleasanton. Determination of the method and manner of the provision of <br /> the funds and/or facilities shall be made by the Pleasanton Unified School !District and the <br /> City, and it may be in addition to the school impact fees required by State law and local <br /> ordinance. The present program is described in documents entitled "Cooperation <br /> Agreement" and "Flat Fee Agreement." The developer shall be required to participate in <br /> the above-referenced program, as it may be amended, or in any successor program, prior <br /> to issuance of any building permit for the project. <br /> <br />74. The applicant acknowledges that the City of Pleasanton does not guarantee the <br /> availability of sufficient sewer capacity to serve this development by the approval of this <br /> case, and that the developer agrees and acknowledges that building permit approval may <br /> he withheld if sewer capacity is found by the City not to be available. <br /> <br />75. This approval does not guarantee the availability of sufficient water to serve the project. <br /> The City shall withhold building permits for the project if at the time building permits are <br /> applied for, mandatory water rationing is in effect, unless the City has adopted a water <br /> offset program and unless the developer is participating in the program. Notwithstanding <br /> the developer's participation in such a program, the City may withhold building permits if <br /> <br />SR:98:89 <br />Page 17 <br /> <br /> <br />