My WebLink
|
Help
|
About
|
Sign Out
ORD 1760
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 4:55:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1760
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. The project developer shall submit a final lighting plan for the building and the site <br />for the review and approval of the Planning Director prior to issuance of building <br />permits. The under-canopy light fixtures shall be limited to a maximum two- <br />hundred and fifty (250) watt bulb. No light source may result in glare onto adja- <br />cent residential properties. This change shall be shown on the final building per- <br />mit plan set submitted for and approval by the Planning Director before issuance <br />of a building permit. Light levels shall be verified by the Planning Director after <br />installation and, if deemed necessary by the Planning Director shall be adjusted to <br />reduce the levels of illumination and/or glare. <br /> <br />6. The developer shall pay any and all fees to which the property may be subject <br />prior to issuance of building permits. The type and amount of the fees shall be <br />those in effect at the time the building permit is issued. <br /> <br />7. Prior to issuance of a building permit, the developer shall pay the required com- <br />mercial development school impact fee as prescribed by state law and as adopted <br />by the Pleasanton Unified School District. <br /> <br />8. Prior to issuance of a building permit, the project developer shall pay the applica- <br />ble Zone 7 and City connection fees and water meter cost for any water meters, in- <br />cluding irrigation meters. Additionally, the developer shall pay any applicable <br />Dublin San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />9. The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval <br />of this case, and that the developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the City not to be avail- <br />able. <br /> <br />10. This approval does not guarantee the availability of sufficient water to serve the <br />project. The City shall withhold building permits for the project if at the time <br />building permits are applied for, mandatory water rationing is in effect, unless the <br />City has adopted a water offset program and unless the developer is participating <br />in the program. Notwithstanding the developer's participation in such a program, <br />the City may withhold building permits if the City determines that sufficient water <br />is not available at the time of application of building permits. <br /> <br />11. The canopy's height shall be lowered to a maximum IS' 0" height measured from <br />grade to the underside of the lowest edge of the fascia panel. This change shall be <br /> <br />City Council Conditions of Approval <br />Case PUD-97-J4 (Chevron) <br /> <br />August J 8, J 998 <br />Page 2 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.