Laserfiche WebLink
Resolution No. PC-99-22 <br />Page 16 <br /> <br />Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br />gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water into street, gutters, or <br />storm drains. <br /> <br />85. The Manning and Jensen parcels shall be a minimum of 1 acre in size. <br /> <br />86. The project shall not be phased and all construction shall be completed in one phase. <br /> <br />87. <br /> <br />The developer shall give notice to any prospective owner of the existing earth quake <br />fault, the potential of development occurring in the Happy Valley area, the projected <br />number of trips using the Bypass Road, and the potential safety issues regarding living <br />adjacent to a golf course. The exact language of the notice shall be approved by the City <br />Attorney. <br /> <br />88. <br /> <br />The applicant shall comply with all regulations proposed by other State, Federal and local <br />jurisdictions. <br /> <br />89. <br /> <br />There shall be a minimum fifty (50) foot setback for habitable structures from the earth <br />quake fault. Non habitable structures, subject to approval of the Chief Building Official, <br />may be built within the earth quake fault zone provided that all other applicable setbacks <br />are met. <br /> <br />90. <br /> <br />All utilities crossing the earth quake fault shall have flex joints, be encased, and have <br />automatic shut-offvalves on either side of the fault to the satisfaction of the City <br />Engineer. <br /> <br />91. <br /> <br />The applicant shall install a water main from the water ptm~p station proposed by <br />Greenbriar Homes near the intersection of Sycamore Road and Alisal Street to the <br />development's water reservoir. <br /> <br />92. <br /> <br />The applicant shall pay a pro-rata share of the cost of the water pump station proposed by <br />Greenbriar Homes. <br /> <br />93. <br /> <br />The applicant shall construct a 690,000+ gallon reservoir at a elevation corresponding to <br />the "Bonde" Zone. <br /> <br />94. <br /> <br />The applicant shall install a dedicated water main from the Sycamore Road transmission <br />line to the Golf Course irrigation pond <br /> <br /> <br />