My WebLink
|
Help
|
About
|
Sign Out
RES 65194
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1960-1969
>
1965
>
RES 65194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2001 2:26:39 PM
Creation date
9/14/2001 6:52:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/22/1965
DOCUMENT NO
RES 65194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120 S[)rlng St, P. 0 Box <br /> <br />?leasanJo% Ca!,f - 94566 <br /> <br />CIVIL ENGINEERS <br /> <br />Phone 84~4464 <br />Area Code 415 <br /> <br />#4058-A <br />ALB <br />10-8-65 <br /> <br />New Items (None) <br /> <br />ARROYO DE VALLE SEWER PROJECT <br />ASSESSMENT DISTRICT 64-3 <br />(QUANTITY CHANGES) <br /> <br />Addition to original items <br /> <br />1. 77 Lin Ft 15" VCP @ 7.90: <br />2. Change proposed location of pump station, lump sum <br /> <br />608.30 <br />2,365.12 <br /> <br /> Explanation <br />1. Due to change in proposed location of pump station. <br />2. Location change due to topographic error. Resulting change caused <br /> increased cut and lengthening of station barrel. <br /> <br />III. Reduction in..ori~inal items <br /> <br />IV. <br /> <br />ADDED COSTS = $ <br /> <br />1. 31 Lin Ft 8" ACPP @ 5.20 = <br />2. 49 Lin Ft 8" CIP @ 8.90 = <br /> <br />Explanation <br />1.& 2. Due to change in proposed location of pump station <br /> <br />Deletion of Original Items {None} <br /> <br /> REDUCED COSTS - <br /> <br />161.20 <br />436J10 <br /> <br />2,973.42 <br /> <br />597.30 <br /> <br />ADDED COSTS: <br />REDUCED COSTS: <br /> <br />$ 2,973.42 <br /> 597.39 <br /> <br />TOTAL INCREASE IN <br /> COSTS: $ 2,376.12 ~ <br /> <br />SUF~ARY OF CONTINGENCY FUND <br />1. Original Amount: <br />2. Project Cost Increase: <br /> <br />Balance Remaining !n Construction <br />Contingency Fund: <br /> <br />$~'7~2.73 <br />.2~7~-t2 <br /> <br />$ ~$,t76.61 <br /> <br />EXHIBIT A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.