My WebLink
|
Help
|
About
|
Sign Out
PC 2000-45
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2000
>
PC 2000-45
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:47 AM
Creation date
8/15/2001 6:14:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/9/2000
DOCUMENT NO
PC 2000-45
DOCUMENT NAME
CEQA Findings
NOTES
Bernal Property
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Meo~re D2a. Require payment of connection fees. <br /> <br /> Measure D2b. Phase development sothat demand for wastewater treatment capacity <br /> does not exceed capacity available to the City of Pleasanton. <br /> <br />Measure D2c. Secure reservations/guarantees for capacity to ensure availability as <br />development occurs. <br /> <br />Measure D2d. Require water conservation measures. <br /> <br />F_jtL(Ii~: Changes or alterations have been required in, or incorporated into, the <br />Project which avoid or substantially lessen the significant environmental effect <br />identified in the Final EIR to a less than significant level. <br /> <br />Facts in Sunt}ort of Finding: The impact will be avoided or reduced based on the <br />following: <br /> <br /> a. The DSRSD/Pleasanton agreement provides for DSRSD to expand treatment <br />capacity to serve Pleasanton's demand from future development. DSRSD is preparing <br />a treatment plant master plan to provide additional capacity to meet anticipated <br />cumulative demand. Thus, the City reasonably anticipates that the DSRSD's <br />conUactual obligation and capacity expansion plan will reduce or avoid this impact. <br /> <br /> b. Payment of the sewer connection fees as required by PUD Condition __ <br />will pay for capacity expansion made necessary by the Project. <br /> <br /> c. The Development Agreement provides a guarantee to ensure that capacity <br />will be available as development occurs. <br /> <br />d. PUD Condition <br /> <br />requires implementation of water conservation <br /> <br /> e. Mitigation Measure D2b is not necessary given the implementation of the <br />other mitigations which achieve the desired result, combined with the reduction in <br />units of residential development and office / commercial square footage under the <br />Gre~nbriar Project. <br /> <br />3. II~_~=~L~. Increase in demand for export capacity. <br /> <br />Measure D3a. Require payment of connection fees. <br /> <br />Measure D3b. Phase development so that demand for wastewater disposal capacity <br />does not exceed capacity available to the City of Pleasanton. <br /> <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.