Laserfiche WebLink
b. ~ae PUD requires the conservation of potable water by incorporating water <br />conservation fixtures and measures into development projects; including the use of <br />water-saving fixtures and water-conS~r'v'ing landscaping, as well as irrigation control <br />systems that include water-saving features. <br /> <br /> c. The PUD requires water conserving interior plumbing fixtures and <br />equipment. (Condition ) Residential CC&Rs must include water conservation <br />educational material and specifications to minimize water consumption in private <br />landscape irrigation. (Condition __ ) <br /> <br /> d. Mitigation measures related to a g°lf course are not necessary because these <br />are fftot part of Phase I. In Phase II, ifa golf course is considered as one of the public <br />uses, further environmental review will occur at that time. <br /> <br /> e. Mitigation measures related to recycled water are not necessary because no <br />recycled water is proposed for the entire Greenbriar Project. <br /> <br />2. Imoact C2. Cumulative increase in demand for water distribution capacity. <br /> <br />Measure C2a. Require paymem of regional and City connection fees. <br /> <br />Measure C2b. Require water conservation measures. <br /> <br />Menaure C2c. Require construction of improvements to the Pleasanton water system <br />to meet City standards. <br /> <br />~: Changes or alterations have been required in, or incorporated into, the <br />Project which avoid or substantially lessen the significant environmental effect <br />identified in the Final EIR to a less than significant level. <br /> <br />Fac~ i~n Support of Findine: The impact will be avoided or reduced based on the <br />following: <br /> <br /> a. The payment of standard connection fees as r0quired by the PUD (Condition <br /> ) will assure that the City has the ability to complete the water distribution system <br />to provide an appropriate citywide standard of service. <br /> <br /> b. The findings under Impact C1, which cover the Projects water conservation <br />measures, are incorporated by reference. <br /> <br /> c. The PUD requires improvements to be constructed to meet the Pleasanton <br />water system standards. <br /> <br />3. Iin_~act C3. Cumulative increase in demand for water storage system capacity. <br /> <br />8 <br /> <br /> <br />