My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program 1. Transportation <br />-- Page 6I <br />TRANSPORTATION <br />Mitigation Measare: J7a(2). Provide the aeceasary [relic controls to maintain safe bicycle <br />and pedestrian circulation along Bernal Avenue through the <br />I-680 interchange area. <br />Impact to be Mitigated: Traffic associated with site development may cause increased vehicular con- <br />Bicts with bicycle and pedestrian traffic on existing and planned bike facili- <br />ties in the vicinity of the project site. <br />Agency/Individual <br />Responsible for <br />Implementation: City of Pleasantoq CalTrane <br />- Implementation Timing: Upon construction of Bemal Avenue improvements and Bemal Avenue/ <br />I-680 improvements <br />- Mitigation Specifications: Traffic controls are dependent on the interchange modification alternative <br />chosen (refer to Measure J26) and must be approved by the City Traffic <br />Engineer. These may include traffic signals to control right-turning traffic <br />exiting from the freeway or redirecting pedestrian and bicycle activity [o <br />one side of Bernal Avenue. <br />Agency/individual <br />Responsible for <br />Monitoring: CiTy of Pleasanton, Public Works Department <br />Action by Monitor: (1) Review and approve plans for traffic controls. <br /> (2) Verify that plans are implemented as approved. <br />Monitoring Timing: (1) Prior [o approval of a final plan for interchange improvement. <br /> (2) Upon completion of interchange improvements. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.