Laserfiche WebLink
Mitigation Monitoring and Reporting Program 1. Transportation <br />-- Page 6I <br />TRANSPORTATION <br />Mitigation Measare: J7a(2). Provide the aeceasary [relic controls to maintain safe bicycle <br />and pedestrian circulation along Bernal Avenue through the <br />I-680 interchange area. <br />Impact to be Mitigated: Traffic associated with site development may cause increased vehicular con- <br />Bicts with bicycle and pedestrian traffic on existing and planned bike facili- <br />ties in the vicinity of the project site. <br />Agency/Individual <br />Responsible for <br />Implementation: City of Pleasantoq CalTrane <br />- Implementation Timing: Upon construction of Bemal Avenue improvements and Bemal Avenue/ <br />I-680 improvements <br />- Mitigation Specifications: Traffic controls are dependent on the interchange modification alternative <br />chosen (refer to Measure J26) and must be approved by the City Traffic <br />Engineer. These may include traffic signals to control right-turning traffic <br />exiting from the freeway or redirecting pedestrian and bicycle activity [o <br />one side of Bernal Avenue. <br />Agency/individual <br />Responsible for <br />Monitoring: CiTy of Pleasanton, Public Works Department <br />Action by Monitor: (1) Review and approve plans for traffic controls. <br /> (2) Verify that plans are implemented as approved. <br />Monitoring Timing: (1) Prior [o approval of a final plan for interchange improvement. <br /> (2) Upon completion of interchange improvements. <br />Monitor: Completion Date: Signature: <br />