My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program J. Transportation <br />Page 60 <br />TRANSPORTATION <br />Mitigation Measure: J7a(1). Maintain a Class I bike lane on Bernal Avenue along the proj- <br />ect site frontage. <br />Impact to be Mitigated: Traffic associated with site development may cause increased vehicular con- <br />flicts with bicycle and pedestrian traffic on existing and planned bike facili- <br />ties in the vicinity of the project site. <br />Agency/lodividual <br />Responsible for <br />Implementation: Site developer <br />Implementation Timing: (1) Incorporate bike lane in preliminary and/or final development plans. <br />(2) Constmet bike lane during construction of Demal Avenue street <br />improvements. <br />Mitigation Specificafions: The PUD Plan incorporates a Class 1 bike lane within Phase I. <br />Special design considerations will be required where the Class I faciliTy <br />intersects with site access roads and driveways. Design components that <br />should be considered include stop signs for the bike facility approaches <br />and bollards to slow bicycle riders. <br />Agency/Individual <br />Responsible for City of Pleazan[on, Public Works Department and Parks and Community <br />Monitoring: Services Department <br />Action by Monitor: (I) Verify [hat bike lane meeting Class I specifications is included in <br /> development plans. <br /> (2) Verify [hat bike lane is built as shown in the plans. <br />Monitoring Timing: (1) Prior to approval of development plans. <br /> (2) Prior [o acceptance of Bemal Avenue improvements. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.