Laserfiche WebLink
San Francisco Water Department Bemal Property <br />Mitigation Monitoring and Reporting Plan <br />Page 2 <br />Verification by the government agency will Typically be accomplished through either staff inspection of <br />the physical result of the mitigation measure or acceptance and approval of documents or plans <br />demonstrating compliance with the mitigation measure. <br />COMPLIANCE FILE <br />The Ciry of Pleasanton will mainmin a file (Compliance File) that tracks implementation of the MMRP <br />and containing the records upon which the City relies in determining that a mitigation measure has or has <br />not been implemented in accordance with this MMRP. The Compliance File will be made available for <br />review upon request by interested government agencies and members of the public. <br />CONTENTS <br />The MMRP is organized under the same topic s[mcmre and order as [he FEIR and consists of a separate <br />page (or pages) devoted to each mitigation measure in the FEIR. For each mitigation measure that is <br />being imposed, the MMRP specifies [he following information: <br />• Mitigation Measure. Provides the identification number from the FEIR, followed by a <br />mitigation statement This mitigation statement summarizes- the required action of the FEIR <br />mitigation measure az it applies to mitigate the identified impact oC[he project. Although the <br />MMRP sets forth the language of some mitigation measures in summary form only, every <br />applicable requirement of each mitigation measure is contained in the Mitigation <br />Specifications (see below) and will, therefore, be implemented and verified. For the full text <br />of each mitigation measure as originally recommended for the project, sea [he FEIR. <br />Impact to be Mitigated. Describes the impact which Viggers the mitigation requirement. <br />• Agency/Individual Responsible for Implementation. Identifies [he party or parties <br />responsible for complying with all requirements of [he mitigation measure. <br />Implementation Timing. Indicates when [he various steps involved in implementing <br />mitigation requirements shall be performed. <br />Mitigation Specifications. Details the specific steps required to fulfill mitigation <br />requirements. Mitigation specifications are organized, where appropriate, according to pre- <br />implemen[ation phase, implementation phase, and post-implementation or monitoring phase. <br />Reporting requirements are specified where applicable. The specifications not only <br />incorporate all actions stated in the full text of the FEIR mitigation measures, but also include <br />performance standards developed by the City to ensure that the FEIR mitigation measures are <br />actually effective in lessening or alleviating [he environmental impacts to which they are <br />directed. Complete implementation of each mitigation measure will thus include a <br />demonstration by [he party responsible for its implementation that the performance criteria <br />are met as a result of the mitigating actions. <br />