Laserfiche WebLink
EXHIRIT "B" <br /> <br /> PDR-46 <br /> CFFY COUNCIL <br />PROPOSED CONDITIONS OF APPROVAL <br />VAL VISTA COMMUNITY PARK <br /> <br />Development shall be substantially as shown on the development plans, Exhibk "A" , <br />dated "Received June 1, 2000" , on file with the Planning Department, except as <br />modified by the following conditions of approval. Minor changes to the plans may be <br />allowed subject to the review and approval of the Zoning Administrator if found to be <br />in substantial conformante with the approved exhibits. <br /> <br />The applicant shall obtain all building and other applicable City permits for ~ntre site <br />improvements. <br /> <br />All conditions of approval shall be attached to all building permit plan check sets <br />submitted for review and approval. These conditions of approval shall be attached at all <br />times to any grading and construction plans kept at the project site. It is the <br />responsibility of the applicant to ensure that the project contractor is aware of, and <br />abides by, all conditions of approval. <br /> <br />Prior to issuance of a building permit, the applicant shall submit design plans for all <br />building on the site for review and approval by the Planning Director. Colors and <br />materials shall be clearly identified on the building elevations. <br /> <br />Prior to issuance of a building permit, the applicant shall submit elevation drawings of <br />all proposed fencing, including; but not limited to, the equipment enclosure proposed for <br />the corporation yard for review and approval by the Planning Director. <br /> <br />Prior to issuance of a building permit, the applicant shall submit a site plan that clea~y <br />details proposed fences, trees, shrubs, concrete V ditches, roads, culverts, drainage <br />inlets and outfall structures with respect to the Zone 7 right-of-way for review and <br />approval by the City Engineer. <br /> <br />The Alamo Canal (Line F) and Line G-l-1 are Zone 7 owned channels that form the <br />westerly and morthefty boundaries of the subject site. The planting of trees along the <br />channel banks shall follow the following Zone 7 recommendations: Line F from G-l-1 <br />junction to 340 feet south, trees shall be planted within the top 1.8 feet; Line G-l-1 from <br />F junction to the proposed bridge, trees shall be planted within the top 2.5 feet; and Line <br />G-I-i from the proposed bridge to 380 feet east, trees shall be planted within the top 1 <br /> <br /> <br />