My WebLink
|
Help
|
About
|
Sign Out
RES 94118B
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1994
>
RES 94118B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2001 7:55:32 PM
Creation date
6/16/2000 4:35:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/18/1994
DOCUMENT NO
RES 94118B
DOCUMENT NAME
GHAD
NOTES
OAK TREE FARM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 <br /> <br />Project No. 5541 <br />1 June 1993 <br /> <br />Plan for Prevention. Mitigation. Abatement. or Control <br /> <br />The appointee of the GHAD Board of Directors shall perform periodic deftring and <br />clean-up of drainage swales, deflection barriers, and other GHAD improvements, as <br />well as periodic visual observation of the site in an effort to uncover and monitor any <br />new potential geologic b.',nrds if any such hazard or potential b~Tnrd is observed, it is <br />recommended that the GHAD would then retain a geologic or gentechnical engineering <br />consultant to further evaluate the potential hazard. <br /> <br />If the consultant identifies a potential geologic hn',nrd that warrants investigation, a <br />detailed recommendation in this regard shall be submitted by the consultant to the <br />General Manager of the CHAD for approval and authorization. Means of investigation <br />could include: <br /> <br />Review of geologic maps, consultant's reports and literature, and aerial <br />photograph <br />Field reconnaissance and mapping <br />Appropriate exploratory excavations and laboratory tests <br />Installation of appropriate monitoring device (piezometers, inclinometers, strain <br />gages, tilt meters, surveying monuments for example) <br />Analysis and calculations <br /> <br />Once the potential geologic baTard has been adequately investigated, monitored and <br />evaluated, the consultant would then provide a plan of action for the mitigation of the <br />ganlogio baTard. These mitigation measures could include: <br /> <br />Excavation and rceompaction of shallow slope failures <br />Installation of additional subdrain systems <br />Repair of surface drainage improvements <br />Construction of additional surface drainage improvements <br />Restoration of eredcd areas and/or removal of siltation deposits <br /> <br />All recommended mitigation measures (and all other operations of CHAD) are subject <br />to the prior approval and authorization of the CHAD General Manager, and are further <br />subject to budgetary, revenue and legal conslraint$ of the district. The gcoteclmical <br />consultant also would provide field observation services during the constnactlon or other <br />implementation of approved geologic mitigation measures. <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.