My WebLink
|
Help
|
About
|
Sign Out
RES 94083
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1994
>
RES 94083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 4:27:10 PM
Creation date
6/15/2000 10:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/19/1994
DOCUMENT NO
RES 94083
NOTES
CIP
NOTES 3
BUDGET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT SUMMARIES <br />This year's programs contain $21,031,563 of funded FY 1994/95 projects. A summary of the major <br />projects includes: <br />STREETS <br />• Provide $ 600,000 in various street resurfacing projects. <br />• Provide $1,000,000 for the Junipero Street Extension as detailed previously. <br />• Complete a resurfacing of Santa Rita Road from Rosewood Dr. to West Las Positas, $173,000. <br />• Utilize $260,000 in developer contributions to complete the undergrounding of utilities on <br />Foothill Blvd. from Stoneridge Drive to Muirwood. <br />PARKS <br />As with previous years, staff attempts to include projects recommended by the City's Parks and <br />Recreation Commission in accordance with their recommended priorities. The listing below includes <br />projects and the status of those recommendations in this program: <br />Park and Recreation Commission Recommendations: <br />• $50,000 be authorized for a demonstration type skateboard/roller blade facility in 1994/95. <br />Status: Funded as recommended. <br />• Authorize expenditure of $72,500 for the restoration of the adobe building at the Alviso Park <br />site. Status: Funded as recommended. <br />• Authorize $100,000 to review the Master Plan and start on plans and specifications for the <br />Tennis and Community Park in 1994/95 with construction to begin in 1995 /96. Status: Funded <br />FY 1994/95- 1996/97. <br />• Funding for Kottinger Community Park Rehabilitation be moved up to 1994/95. Status: Funded <br />as recommended. <br />• $150,000 be authorized for the sidewalk in Sports Park and moved up to 1994 /95. Status: <br />$175,000 funded in FY 1994/95. <br />
The URL can be used to link to this page
Your browser does not support the video tag.