Laserfiche WebLink
Section 9 <br />b. <br />a. <br />b <br />c <br />If the building plans have been submitted to the <br />Building Division of the Department of Community <br />Development within the time period specified above <br />for each use category, or such other time period <br />specified the City Council, and the necessary plan <br />checking has not been completed within said time <br />period no forfeiture of fees shall occur. <br />MISCELLANEOUS <br />Unless otherwise expressly provided by the City Council <br />all sewer connections referred to in the above use <br />categories shall be issued by the Building Division <br />of the Department of Community Development on a first <br />come, first served basis. If any sewer connections <br />are expressly designated for a particular user they <br />shall be held for each specified user until such time <br />as the time limits referred to in the specific allo- <br />cation resolution have expired and then may be dis- <br />tributed, on a first come, first served basis, at the <br />discretion of the City Council. <br />Unless otherwise expressly provided by the City Council, <br />within 14 days after building plans have been approved <br />by the Building Division of the Department of Community <br />Development, the required building permit shall be <br />obtained. Failure to obtain a building permit within <br />the time period specified herein shall cause the <br />outstanding sewer connection permit to become void and <br />the fee paid shall be deemed forfeited. <br />Any building plans submitted pursuant to this resolution, <br />in order to toll the running of the time limits herein <br />shall be of a quality acceptable to the Chief Building <br />Inspector of the Building Division of the Department <br />-10- <br />