Laserfiche WebLink
TABLE1 <br /> <br />Shared Infrastructure Improvement Components and Estimated Costs <br /> <br />Part 1 - Includes Lots 1-17 located in the western portion of the Vineyard Avenue Corridor area. <br /> <br />Infrastructure <br />Component <br />Sewer <br /> <br /> Sewer <br /> Roadway <br /> <br />Type of Improvement <br /> <br /> Estimated <br /> Cost <br />Twelve-inch replacement trunk line from Bernal Avenue to $430.000 <br />Tioga Court <br />Ten-inch trunk line from Tioga Court to the southwest corner $200.000 <br />of Lot 8 at Vineyard Avenue <br />Sidewalk (including retaining wall) along the south side of $180,000 <br />Vineyard Avenue from the western border of Lot 1 to Lot 15 <br /> <br />Part 2 - Includes Lots 22-24 located south of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor area. <br /> <br />Infrastructure <br />Component <br />Water <br /> <br />Sewer <br /> <br /> Type of Improvement <br /> <br />Sixteen-inch water trunk line within the existing <br />Vineyard Avenue, and Zone 7 Turn-out #6 <br />modifications <br /> <br />Sewer pump station and force main <br /> <br />Estimated Cost <br /> <br /> $960,000 <br /> <br />$520.000 <br /> <br />Part 3 - Includes Lot 18 located north of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor Area. <br /> <br />Infrastructure <br />Component <br />Sewer <br /> <br />Type of Improvement <br /> <br />Eight-inch sewer trunk line within the realigned <br />Vineyard Avenue from the new pump station to the <br />east end of Lot 18 <br /> <br />Estimated Cost <br /> <br /> $160.000 <br /> <br /> Roadway Realignment of Vineyard Avenue from the east end of $1.500,000 <br /> the "S"-curve to the east end of Lot 18 <br />Storm Water Outfall at Lot 18 $21,000 <br />Detention <br /> <br /> <br />