Laserfiche WebLink
CITY OF PLEASANTON <br /> <br />[SHOR T- TEf~M OBJEC rl VES) <br /> <br />FROM: TO: <br /> <br />c~-i Upgrading of Utilities <br /> <br />Approximately 2700' of deteriorated water mains will be replaced in <br />the Harris Acres section of the core area. Harris Acres is pre- <br />dominently an area of lower income households. Existing water mains <br />are so constricted that flow is not sufficient for proper fire <br />suppression, thereby, creating a situation inimical to public safety <br />in the area. Supports Need B-1. <br /> <br />~per~s Need(s) <br /> <br />c'-2 Street Extension <br /> <br />Peters Avenue will be extended some 375' from its present terminus at <br />Division Street southward to Rose Avenue. This improvement in cir- <br />culation facilities should promote revitalization of both the resi- <br />dential and commercial sectors of the core area. It is in accord <br />with the City's general plan and the revitalization plan for the <br />downtown area. Supports Needs B-1 and B-2. <br /> <br />c"3 Rental Assistance <br /> <br />Rental assistance for low income households in existing housing, to <br />the extent that Section 8 assistance is available, will be implemented <br />through the Housing Authority of Alameda County. The objective is to <br />utilize Section 8 funding as set forth in Tables III and IV of the <br />Housing Assistance Plan. Supports Need B-2. <br /> <br />Suppore Needl,) <br /> <br />HUD-7015.4 (11-75) <br /> <br /> <br />