My WebLink
|
Help
|
About
|
Sign Out
RES 77203
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1977
>
RES 77203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2001 7:55:22 PM
Creation date
3/16/2000 5:54:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/25/1977
DOCUMENT NO
RES 77203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Actual Construction Costs: <br /> <br />The figures set forth in Section I.A. <br /> <br />costs. Agency's share of cost shall <br /> <br />are the latest estimates of construction <br />be determined by substituting the actual <br /> <br />construction costs in lieu of the estimated costs utilizing the methodology <br />outlined in Section I.A. Actual construction costs shall be those directly <br />related to construction and necessary for the functioning of said pipeline <br />system to accommodate Agency's flows as set forth in Section I.A.; said costs <br />include the total contract amount awarded to the contractor, any change orders, <br />force account work for construction related items, and any damages or settle- <br />ments directly related to construction. Any liquidated damages collected for <br />not completing the work on time will reduce the actual construction costs <br />accordingly. Costs for general administration, design, surveys, inspection, <br />testing, contract administration, shop drawings reviews, and legal expenses <br />borne by the Authority shall not be included as construction costs, but are <br />considered as included in the 20% Indirect Cost factor agreed upon in Line 7 <br />of Section I.A. Right of Way acquisitions resulting in recorded or deeded <br />interests in land, and all associated costs to obtain those interests are not <br />to be included in constructions costs. <br /> <br />Grants and State Loans: <br /> <br />Any state, federal or other grants received by Authority for those facilities <br /> <br /> in which Agency is participating will be credited to Agency's Share of Total <br /> # <br /> <br />Cost in proportion to the funding agencies' determination of eligible costs <br /> <br />.of Agency and Authority. Any grant ineligible costs identified with Agency <br /> <br />or Authority will be paid fully by the party benefiting from the grant- <br />ineligible facilities or capacity. Under no circumstances will the construction <br />of grant-ineligible facilities or capacity to serve one party increase the <br />cost to the other party. <br /> <br />A-2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.