Laserfiche WebLink
RESOLUTION <br />Page 3 <br /> <br />NO. 78-120 <br /> <br />16. That all parking spaces be striped and provided with <br />wheel stops unless they are fronted by concrete curbs, <br />in which case sufficient areas shall be provided beyond <br />the ends of all parking spaces to accommodate the <br />overhang of automobiles. <br /> <br />17. That all utilities required to serve the development <br />be installed underground. <br /> <br />18. That the applicant enter into an agreement with the <br />City approved by the City Attorney which guarantees <br />that all landscaping included in this project will be <br />maintained in a healthful, attractive and weed-free <br />manner. Said agreement shall be recorded and shall run <br />with the land for the duration of the existence of the <br />structures located on the subject property. <br /> <br />19. That the developer install street trees as required <br />per ordinance. <br /> <br />20. That any damage to street improvements now existing <br />or done during construction on the subject property be <br />repaired at full expense to the developer. <br /> <br />21o That silhouette, low-level lighting be provided around <br />the perimeters of all buildings on the subject property. <br /> <br />22. That if required by the Police Department, the building <br />be equipped with an alarm system, the type to be approved <br />by the Police Department and that this system shall be installed <br />prior to final building inspection. <br /> <br />23. That approval of this development does not guarantee <br />that the developer will receive sewage connections, now <br />or at any time in the future. This development is in the <br />Sunol Sewer Service area and is subject to the allocation <br />formula established by Resolution 76-83. Until provision <br />for sewage treatment has been arranged, no building permits <br />may be issued for the development of any or all of the <br />project. No estimate can be made as to when this development <br />may obtain sewer permits. Should the applicant wish to use <br />a private sewage disposal method (i.e., a holding tank), <br />approval of such a private system would provide no priority <br />for sewer connections. <br /> <br />24. That the site be kept free of fire hazards from the <br />start of construction to final inspection and that the <br />Fire Department emergency number be provided adjacent to <br />all telephones on the site. <br /> <br /> <br />