My WebLink
|
Help
|
About
|
Sign Out
RES 78241
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1978
>
RES 78241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 3:56:36 PM
Creation date
3/14/2000 6:11:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/12/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. PHASE I - PRELIMINARY STUDIES AND REPORT <br /> <br />Engineer shall furnish and perform the following services as part of Phase I. <br /> <br />Prepare preliminary geometric and conceptual studies for railroad grade <br />separations at the aforesaid South Verona Underpass, Bernal Avenue Under- <br />pass, and the Del Valle Parkway Separation sites only inasmuch as the <br />preliminary engineering requirements for the Murrieta Boulevard Underpass <br />have previously been completed for the City of Livermore. <br /> <br />The preliminary layouts shall include possible conflicts with, or required <br />relocations of, underground utilities or surface drainage facilities, and <br />structural plans. <br /> <br />For the Del Valle Parkway site only, the conceptual studies shall include <br />alternative preliminary geometric layouts of underpass and overpass <br />separation structures. <br /> <br />Consult with Railroads with respect to location of piers and footings on <br />railroad property and/or adjacent to railroad tracks, shooflys, and other <br />design requirements. <br /> <br />Evaluate requirements for pedestrian sidewalks and bicycle paths. <br /> <br />Present reconmmendations as to the most feasible and economic structure <br />for the conditions at each separation site. <br /> <br />Develop preliminary plans for maintaining vehicular and rail traffic dur- <br />ing construction. <br /> <br />Consult with the Alameda County Flood Control District with respect to <br />drainage flow requirements, channel clearances, and alignment required <br />for affected drainage channels or drains at any of the separation sites <br />or where new railroad track connections are proposed. <br /> <br />Where appropriate, prepare preliminary stage construction plan for initial <br />construction of minimum feasible portion of the ultimate grade separation. <br /> <br />Develop total preliminary cost estimates, and a financial analysis showing <br />net costs to be defrsyed from local sources for the Project, giving con- <br />sideration to contributions expected to be received from Railroads and <br />matching funds available under Sections 190 and 2450 st. seq. of the <br />Streets and High_ways Code (Grade Separation Act).. <br /> <br />Prepare environmental impact analysis and report for the portion of the <br />project from Sunol to the westerly city limits of Livermore. <br /> <br />Assist the City of Livermore as may be required in connection with a <br />negative declaration for portions of the project within the City of <br />Livermore and Murrieta Boulevard Underpass. Prepare report (number of <br />copies to be determined). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.