My WebLink
|
Help
|
About
|
Sign Out
RES 78286
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1978
>
RES 78286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 1:41:24 PM
Creation date
3/14/2000 5:57:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/14/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the conditions of design review mentioned pre- <br />viously, the developer should be aware of the following city <br />requiremen~j.~: <br /> <br />That the developer submit a building permit survey and site <br />development plan in accordance with the Survey Ordinance <br />(Article 3, Chapter 3, Title II) and that these plans be <br />approved by the Director of Engineering Services prior to <br />the issuance of a building'permit. <br /> <br />That the site development plan include all required information <br />to design and construct site, grading, paving and drainage. <br /> <br />That the paving sections for the parking and drive areas be <br />designed on the basis of an R-Value test and a Traffic Index <br />to carry the anticipated traffic load. This design shall be <br />subject to the approval of the Director of Engineering Services. <br />The minimum paving section shall be 2" A.C. on 5" A.B. The <br />minimum A.C. pavement slope shall be 1%. <br /> <br />That the developer's contractor obtain an encroachment permit <br />from the City prior to the beginning of construction. <br /> <br />That the developer pay any and all fees that the property may <br />be subject to including in-lieu park dedication fees. <br /> <br />That the on-site storm drain system be designed to outfall into <br />the existing 12" reinforced concrete pipe stub. <br /> <br />That the on-site sanitary sewer system be designed to outfall <br />to the existing lateral. <br /> <br />That the site development plan include sufficient cross sections <br />at the south property line bank. <br /> <br />-4- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.