My WebLink
|
Help
|
About
|
Sign Out
RES 79047
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1979
>
RES 79047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2012 9:50:26 AM
Creation date
3/14/2000 5:15:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/29/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> <br />RAILROAD TRACK CONSOLIDATION PROJECT PROPOSAL <br /> <br />The Railroad Track Consolidation Project shall consist of a con- <br />solidation at the Western Pacific Track alignment with grade <br />separations at Bernal Avenue and Del Valle Parkway. The project <br />shall consist of the following elements, modifications and mitiga- <br />tion measures. <br /> <br /> 1.~ Underpasses at the Bernal Avenue and Del Valle Parkwa~ grade <br /> separations. <br /> <br />2. Del Valle Parkway continued to connect with Main Street. <br /> <br />3. Del Valle Parkway continuation to consist of two traffic <br /> lanes, with the underpass constructed with two traffic <br /> lanes with a potential expansion to four. <br /> <br />4. Parkway restricted to auto traffic and light truck traffic <br /> through vehicle load limit ordinance. <br /> <br />5. Parkway raised median continued through extension. <br /> <br />6. Parkway speed limited to the lowest permitted by state law. <br /> <br />7. Crosswalks to be painted at appropriate parkway intersections <br /> for pedestrian use. <br /> <br />8o Parkway to be signed to warn drivers of pedestrian crosswalks. <br /> <br />9. Traffic signal to be installed at parkway and Main Street <br /> intersection. <br /> <br /> 10. Main Street lane configuration to be modified to provide <br /> necessary lanes and re-striped. <br /> <br />11. Del Valle Parkway-Main Street traffic light to be phased to <br /> work with Stanley-Main traffic light. <br /> <br />12. Any displaced residences or business to be given relocation <br /> assistance. <br /> <br />13. City approve, where appropriate, the moving of displaced resi- <br /> dential structures to appropriately zoned sites. <br /> <br />14. Construction to be staged to avoid closed traffic lanes during <br /> peak hours. <br /> <br />15. Construction to be limited to daytime hours and week days. <br /> <br />16. Construction area to be sprinkled. <br /> <br />17. Haul routes designated and street cleanup required. <br /> <br />18. Contractor's plans 'for disposal or acquisition of earth <br /> material to be submitted to City for approval. <br /> <br />19. Underpasses signed to prohibit skateboarding. <br /> <br />20. Install wet-weather pumping facilities for underpasses. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.