My WebLink
|
Help
|
About
|
Sign Out
RES 81129
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1981
>
RES 81129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2012 9:20:56 AM
Creation date
3/7/2000 7:19:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provided at the time(s) required by the report. The <br />level of participation shall take into consideration <br />the project's contribution towards City services <br />generally, including fire services. <br /> <br />That development on the subject property may con- <br />tinue until the intersections at Hopyard Road/Meyer <br />Drive, Hopyard Road/Stoneridge Drive, or Stoneridge <br />Drive/Denker Drive reach level of service D as <br />described in the Traffic Analysis dated December 24, <br />1980, prepared for developer by TJKM previously <br />filed with the City by developer. Until that time, <br />developer need not construct more than the project's <br />interior street improvements, complete the Hopyard <br />Road frontage and median modification, widen Stone- <br />ridge and construct the new median and install signals <br />at Stoneridge Drive/Denker Drive and Hopyard Road/Meyer <br />Drive - all as provided in developer's plan. At <br />such time, no construction on the site not already <br />started may be commenced until developer performs a <br />traffic analysis to determine which specific measure <br />described in the following paragraph should then be <br />constructed to mitigate the traffic conditions at the <br />particular intersection in order to return it to <br />level C. ~ew construction on the site shall be <br />allowed only when the traffic improvement so required <br />is ~nder construction or an assessment district <br />which will fund the improvement has been formed. <br />The mitigating measures as as follows: <br /> <br />a. Construction of Stoneridge Drive/I-680 <br /> interchange. <br /> <br />b. Widening of Hopyard Road/I-580 bridge. <br /> <br />c. Widening of Hopyard Road to six lanes from <br /> 1-580 to Valley Avenue. <br /> <br />d. Add a right-turn lane southbound on Hopyar~ <br /> Road at Johnson Drive. <br /> <br />e. Widen eastbound Johnson Drive approach to <br /> accommodate another left-turn lane (this <br /> is the obligation of Reynolds and Brown). <br /> <br /> f. Modify existing Hopyard Road/Johnson Drive <br /> traffic signal timing (this is the obligation <br /> of Reynolds and Brown). <br /> <br />g. Add two left-turn lanes northbound on <br /> Hopyard Road at Meyer Drive. <br /> <br />Improvements a through g will be funded through an <br />assessment district to which all benefitted land <br />owners in the north Pleasanton area are a party. <br />City agrees to facilitate any required construction <br />by issuing or obtaining necessary permits, consentS, <br />e~c. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.